Description
The purpose of the wet duster is to mix rockdust with water and create a cement
type mixture that can be sprayed throughout the mine while workers are inby. This unit
can be transported in the scoop bucket. In-tank mixers mix the dust and water while a
progressive cavity pump feeds the wet dust through up to 400’ of 1” hose.
Specifications
• 270 or 520 Gallon Hopper Capacity
• Available in skid mount, rubber tire or rail
• PTO requirement: 15 – 17 gpm
• In-Tank mixers agitate the dust and water to a slurry mixture
• (1) Progressive Cavity pump transfers dust through up to 400’ of 1” hose
• Heavy Duty perimeter package
• 50 degree brass nozzles
• Up to 13,000 square feet of coverage per filling
• Bolt-on covers for easy hopper access
Dimensions
• 270 Gallon Frame size 7’ X 7’ X 27” High
• 520 Gallon Frame 7’X7’X 38” High
• Weight 2,250 lbs.